Permit Applications

BUILDING PERMIT applications
Residents, contractors and developers should be aware of all building permit requirements before alterations, additions or new construction are made to a property.

Click here for a Building Permit Application. Helpful permit installation guidelines are available by expanding the green Permit Application Handouts bar at the bottom of the page.
building permit fees
BUILDING   PERMIT TYPE FEE AMOUNT
AIR CONDITIONER/FURNACE - RESIDENTIAL $50.00
DECKS, PORCHES, GAZEBOS $100.00
DRIVEWAYS ONLY (ADDITIONAL FEES FOR A WALKWAY/STOOP) $60.00
ELECTRIC SERVICE $100.00
FENCES - RESIDENTIAL $40.00
FENCES - COMMERCIAL/MULTI-FAMILY                             $100.00
FIREPLACE $100.00
LOW VOLTAGE, VOICE/DATA, COMMERCIAL BURGLAR ALARMS $100.00
PATIOS/WALKWAYS/MISCELLANEOUS FLATWORK $50.00
POOLS - ABOVE GROUND $100.00 + Electric   Fees
POOLS - IN GROUND $200.00 + Electric   Fees
RACKING $200.00
RESIDENTIAL CHICKEN KEEPING $50.00
ROOFS - RESIDENTIAL $40.00
ROOFS - COMMERCIAL/MULTI-FAMILY $100.00 Per Building
RPZ - LAWN SPRINKLER BACKFLOW PREVENTION   $75.00
SEWER REPAIR $75.00
SHEDS $40.00
WATER HEATERS $50.00
WATER LINE REPAIR $75.00
RE-INSPECTION FEES (NOT READY FOR INSPECTION)    $100.00
TEMPORARY OCCUPANCY FEES - RESIDENTIAL $75.00
TEMPORARY OCCUPANCY FEES - COMMERCIAL $150.00

For a comprehensive list of building permit fees not listed above, click here: Village Code section 3-1A-3: Fee Schedule, Ordinance 2019-53  
residential chicken keeping pilot program
The Woodridge Residential Chicken Keeping Pilot Program will run from April 5, 2024, until October 5, 2025. There is no maximum number of participants or deadline to participate in the pilot program. An inspection of the coop is required before chickens may occupy the space. Prior to expiration of the pilot program, the Village Board will determine if keeping chickens will continue to be allowed in the Village. If the program is continued, permittees would be required to register annually. There would be an annual inspection, and a fee of $50. New coop permits would continue to be granted. If the pilot program is not continued, no additional chicken keeping permits would be granted, and existing permittees would be required to remove all chickens, coops, and associated items from their properties within an established timeframe. During the initial pilot program, permit holders are subject to the regulations listed herein. Any coop that is issued three or more code violations will be required to be removed and will not be allowed to continue in the program.

Click here to fill out a Residential Chicken Keeping Pilot Program Application

All submittal items must be included in one package and must be delivered in person the the Community Development Department located on the first floor of Village Hall at 5 Plaza Drive.

SUPPLEMENTAL HANDOUTS providing installation guidelinesThe permit application handouts in the green drop down below provide supplemental information for each type of project that requires a permit with the Village along with a building permit application at the end of the document. Type a key word, such as deck, shed, fence, etc., in the search box or click on the green "Permit Application Handouts" bar to expand the comprehensive list of permit categories.
Doc app

Document Center

The Document Center provides easy access to public documents. Click on one of the categories below to see related documents or use the search function.

Categories always sorted by seq (sub-categories sorted within each category)
Documents sorted by HEADER in Ascending Order within category

Permit Application Handouts29 documents

  • Adopted Code List
    document Header Adopted Code List
  • Aging-In-Place Residential Remodeling Guide
    document Header Aging-In-Place Residential Remodeling Guide
  • Backflow Prevention (RPZ) FAQ's Guide Handout
    document Header Backflow Prevention (RPZ) FAQ's Guide Handout
  • Basement Finish / Build-Out / Remodel Guide
    document Header Basement Finish / Build-Out / Remodel Guide
  • Commercial Permit Requirements Guide
    document Header Commercial Permit Requirements Guide
  • Contractor Requirement Guide
    document Header Contractor Requirement Guide
  • Deck Design & Installation Guide
    document Header Deck Design & Installation Guide
  • Driveway (Residential) Installation Guide
    document Header Driveway (Residential) Installation Guide
  • Electric Service Upgrade (SFR) Guide & Checklist
    document Header Electric Service Upgrade (SFR) Guide & Checklist
  • Fence Installation Guide
    document Header Fence Installation Guide
  • Garage (Residential) Installation Guide
    document Header Garage (Residential) Installation Guide
  • Generator Installation Guide
    document Header Generator Installation Guide
  • Inspections Required Guide
    document Header Inspections Required Guide
  • Lawn Irrigation / Sprinkler with FAQ's Guide
    document Header Lawn Irrigation / Sprinkler with FAQ's Guide
  • Low Voltage & Permanent Furniture Installation Guide
    document Header Low Voltage & Permanent Furniture Installation Guide
  • New Single Family Residence Guide
    document Header New Single Family Residence Guide
  • Pallet Racking Installation Guide
    document Header Pallet Racking Installation Guide
  • Patio / Service Walk / Grill / Fire Pit (Flatwork) Guide
    document Header Patio / Service Walk / Grill / Fire Pit (Flatwork) Guide
  • Permit Fees
    document Header Permit Fees
  • Residential Chicken Keeping Pilot Program
    document Header Residential Chicken Keeping Pilot Program
  • Residential Remodeling & Room Addition Guide
    document Header Residential Remodeling & Room Addition Guide
  • Roof Installation Guide
    document Header Roof Installation Guide
  • Shed and Playhouse Installation Guide
    document Header Shed and Playhouse Installation Guide
  • Sign Permit Guide
    document Header Sign Permit Guide
  • Solar Photovoltaic Installation Guide
    document Header Solar Photovoltaic Installation Guide
  • Swimming Pool and Hot Tub Installation Guide
    document Header Swimming Pool and Hot Tub Installation Guide
  • Temporary Sign Request Guide
    document Header Temporary Sign Request Guide
  • Water and Sewer Installation Guide
    document Header Water and Sewer Installation Guide
  • Water Heater Guide
    document Header Water Heater Guide